Finlede
Follow the money.
Friday, 27 November 2026
Home and Diaspora edition
Sign in
USD/ZAR17.54▼0.25%GBP/USD1.316▼0.40%USD/ZiG26.5▼0.11%Gold (oz)3,624▲1.61%
Tender

Desludging of sewer ponds

City of Bulawayo

Time left to bid11 daysTuesday 8 December at 11:45
BuyerCity of Bulawayo12 open tenders, 160 awards on file
Who can bid2Construction and works
Kind of workNon-consultancy servicesCompetitive Bidding Method

What to prepare

  • Be registered as a supplier under Construction and Civil Works (buildings, dams, roads etc.) (New),Plumbing & Related (Jobbing) Services (codes SC006, SP005). Register or check your categories.
  • Submit before the deadline: Closes in 11 days, Tue 8 Dec, 11:45.
  • Procurement method: Competitive Bidding Method, under the Zimbabwe PPDPA Act Rules.
  • Lots: Single Lot.
  • The bid form is free, as the notice states.
  • No addendums have been issued so far.
  • Delivery to Magwegwe Ponds within 60 day(s).
  • Your bid must stay valid for 90 days.
  • Funding: Procuring Entity Internal Budget Funding.
  • Price every line item listed below (24 in all).

Read the full notice and the bidding documents

Line items, 24 in all

No.ItemQuantityUnit
1Allow for all contractual equipments i.e insurance, performance bonds and workman's compensation (Sewer line construction service)1Lump Sum
2Allow for decommissioning of existing of ponds in a sequential manner to allow for desluding (Sewer line construction service)1Lump Sum
3Allow for testing Commissioning and training (Sewer line construction service)1Lump Sum
4Site establishment, fencing, signage and ablutions (Sewer line construction service)1Lump Sum
5Health and Safety file, PPE, gas monitoring (Sewer line construction service)1Lump Sum
6Supply and delivery of wooden office table with 6 drawers (Sewer line construction service)1Each
7Fabric visitor’s chairs with resting arms (Sewer line construction service)6Each
8Supply and delivery of new Laptop (Sewer line construction service)1Each
9Supply and delivery of a 4X4 OFFROAD PICKUP (Sewer line construction service)1Each
10Supply and delivery of 304L Fridge (Sewer line construction service)1Each
11Dewatering and bypass of effluent to next pond. (Sewer line construction service)7Each
12Mechanical desludging using 20-ton long reach excavator with12m boom to scrape sludge to chopper sump. (Sewer line construction service)7Each
13Loading and hauling of sludge to temporary drying beds within site (m3) (Sewer line construction service)1Lump Sum
14Haulage and Disposal dried sludge to land fill site approved by EMA (m3) (Sewer line construction service)1Lump Sum
15Supply and Installation Of Membrane with the following specifications 1.5mm, 1500micron HDPE liner, Geosynthetic clay liner and 300mm soil protection(m2) (Sewer line construction service)4950Each
16Repairing of any structure that have been damaged during desludging (m2) (Sewer line construction service)1Lump Sum
17Supply, delivery and install of a grit pump No1 950rpm, 7.5HP, 5.5KW, 390V, 3phase. Grit pump No 2. 400v, 5.5kw, 1440rpm, 11,2amp and Recirculation pump 4.8amps, 1450 rpm, 380v, 3HP. (Sewer line construction service)3Each
18Supply and installation of suction pipe to the recirculation pump (Sewer line construction service)1Each
19Supply and installation of palisade fence around the intake works using 40mm x 40mm angle iron and 80x80m channel iron (Sewer line construction service)1Each
20Supply, delivery and installation of 3m treated gum poles around ponds (Sewer line construction service)80Each
21Supply and install 200 Watts solar lights in strategic points mounted on 6m steel round tube with the following specifications green energy, light automatically when its dark work - 12 hours when fully charged, water proof IP 65, light sensation and remote control. (Sewer line construction service)14Each
22Supply,install and commission inflow meter altistart 22, ATS22D32Q ICI 32A. 230-440V-30.5050Hz, 230v, 7.5kw and outflow meter, model AGELD-101--21132, Normal pressure1.0mpa, accuracy 10.2%, diameter DN100, Electrode material HC (Sewer line construction service)2Each
23Resuscitation of roof shade asbestos at intake works. (Sewer line construction service)1Lump Sum
24Add 10% contigencies (Sewer line construction service)1Each

The tender

Reference
COB/WSD/SB/01/2026
Published
13 November 2026, 10:30 Harare
Closes
Tuesday, 8 December 2026 at 11:45
Who may bid
Open bidding
Delivery
Magwegwe Ponds, 60 Day(s)
Funding
Procuring Entity Internal Budget Funding

Who won last time

The latest contract awards by City of Bulawayo, from published award notices.

All 160 awards by City of Bulawayo

Sources: PRAZ eGP, the UN Global Marketplace and buyers’ own websites. Finlede lists tenders for information. Read the full notice and bidding documents before you bid.

The morning digest

The day's money stories, before work

One message each morning with the stories that matter. Free, and one tap to stop.

Prefer your phone? Get it on Telegram.
Your story

Have a story for us?

News about money, business or prices where you are. Tell the newsroom and we will look into it.

Tell us your story