Finlede
Follow the money.
Thursday, 19 November 2026
Home and Diaspora edition
Sign in
USD/ZAR17.24▲1.84%GBP/USD1.316▲0.00%USD/ZiG26.56▼0.17%Gold (oz)3,740▼0.79%
Advertisement
Companies and Investment

Zimbabwe exporting power surplus to regional grid, says Murwira

Zimbabwe is now exporting a surplus of 200 megawatts of electricity to the regional power grid.

Companies and Investment Finlede

Sign in to save this story

Zimbabwe is now exporting a surplus of 200 megawatts of electricity to the regional power grid. Foreign Affairs and International Trade Minister Amon Murwira said the country had shifted from being a net importer to a supplier for neighbours. He called the change a clear success.

Murwira made the remarks during an interview on ZBC's Face the Nation programme on 30 October 2026. At the same time, power utility ZESA Holdings reported that Zimbabwe had gone 304 days without scheduled load-shedding. The utility needs another 61 days, until around 27 December, to mark a full year without cuts.

Current generation stands at about 1,384MW. Hwange Thermal Power Station produced 919MW on 30 October, Kariba South Hydropower Station added 415MW, and independent power producers contributed 50MW. This marks a sharp turnaround from recent years when homes and businesses faced blackouts of up to 18 hours a day.

Advertisement

The gains come mainly from new capacity at Hwange. Units 7 and 8, commissioned in 2023, added 600MW to the grid. That step cut the need for imports and brought more stable supply. The government is now working to fix older units 1 to 6, which often break down and run below full capacity.

Zimbabwe Power Company figures show the extra output has allowed exports while meeting local demand. As Finlede has reported before, the Hwange expansion has already saved the country US$92 million in foreign currency that would have gone on imported power.

If you run a business that lost sales during long outages, or pay higher generator fuel costs, this stability changes the picture. Fewer blackouts mean lower running costs and more reliable production. The builder in Cape Town saving for a stand can count on steadier projects back home.

The regional grid takes the 200MW surplus. That brings in revenue from sales to neighbours instead of spending scarce dollars on imports.

Watch the final 61 days. If Zimbabwe reaches a full year without load-shedding by late December, it will confirm the shift from shortage to surplus is holding.

Advertisement
Reported from:

Something in this story need updating? Ask for a correction.

The morning digest

The day's money stories, before work

One message each morning with the stories that matter. Free, and one tap to stop.

Prefer your phone? Get it on Telegram.
Your story

Have a story for us?

News about money, business or prices where you are. Tell the newsroom and we will look into it.

Tell us your story